![]() Install all electrical and instrumentation and control equipment and panels for the Train A and B primary treatment processes.New pre-engineered Electrical Building.building lighting, wiring, conduits, and electrical receptacles.building ventilation supply and exhaust fans and ductwork.inlet gates to grit basins and other gates at the grit basins’ structure.grit suction pipes between grit basins and PTB.existing grit separation systems, including grit classifiers and pumps, piping, and valves.primary sludge pumps and associated valves and piping.Demolish and remove: o existing scum pumps, valves, and piping o all equipment and panels in existing PTB electrical room o various other defunct systems in the building – polymer, chlorine, high pressure air, tank, speaker call system.Train A&B Preliminary Treatment Building (PTB) and Grit Basins: ![]() Replacement of the existing multi-mode fiber optic cable with single-mode 72 strand fiber optic cable throughout Trains A&B.The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of the following: Replacement of Fiber Optic Network at Trains A&B: South Austin Regional WWTP Trains A & B Improvements
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |